opic: Final Review Topic: Final Review enry Liu Henry Liu CE 4211/5211 – Traffic Engineering University of Minnesota email: henryliu@umn.edu
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Actuated Signal Operation
Background image of page 2
Phase Interval Times Interval Phase 1 2 3 4 5 6 7 8 alk Walk P e d C l e a r Initial 6 14 6 8 9 10 6 10 Extension 2.0 3.0 3.0 2.0 2.0 3.0 3.0 2.0 Max 1 20 50 15 35 20 50 15 35 M a x 2 Yellow 3 5 3 4 3 5 3 4 Red 1 1 1 1 1 1 1 1 Permit Max Recall Min Recall P e d R e c a l l Lag Phase
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ual ing Operation Dual-Ring Operation
Background image of page 4
ffective Green Effective Green aturation flow e saturation flow scharg effective green time g e of di s rat me lost time lost time time
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Time Budget and Critical Lane The time allocation of 3600 seconds in an hour to conflicting movements and to lost times incurred in the cle due to the starting and stopping of these cycle due to the starting and stopping of these movements The amount of time required for each signal phase is determined by the most intensely used lane which is permitted to move during the phase. This lane is ferred to as the “ tical lane referred to as the c ritical lane . Each signal phase has one and only one critical lane. ll other lane movements in the phase require less time All other lane movements in the phase require less time than the critical lane.
Background image of page 6
Critical Lane Volume Consider the heaviest per-lane volume by phase, the volume that can be handled in the 3600 seconds is: 3600 600 1 T )] )( )( ( 3600 [ C t N h h V V L G ci C V c = max sum of critical lane volumes which can be accommodated in an hour (vph) G = time available for effective green allocation within an hour TG = time available for effective green allocation within an hour Also see Figure 16-4
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Adding Consideration of the PHF
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/07/2012 for the course CE 4211 taught by Professor Preston,h during the Spring '08 term at Minnesota.

Page1 / 22

Final_Exam_Review [Compatibility Mode] - Topic: Final...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online