H3 - 6 a Daytime Minutes Evening Minutes Plan A Monthly...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 6 a Daytime Minutes Evening Minutes Plan A Monthly Service $ Daytime $ /min Evening $ /min Total Plan C Monthly Service $ First 200 min $ /min after 200 Total 120 40 Plan AC $ 20.00 $ 20.00 $ 0.45 $ 54.00 $ 0.20 $ 8.00 $ 82.00 Plan AC $ 20.00 $ 20.00 $ 80.00 $ 80.00 $ 0.40 $ 100.00 Plan B Plan AC Monthly Service $ $ 20.00 $ 20.00 Daytime $ /min$ 0.55 $ 66.00 Evening $ /min $ 0.15 $ 6.00 Total $ 92.00 x b c For Daytime Calls Plan A is the most optimal from 1-177 minutes. From 178 minutes and so on Plan C is the most optimal Indifferent between plans A and B if 33.33% of the minutes used were daytime minutes 12 I'm opinon one line because even if the demand fell at the highest end of the projection (18 cars/hr) profit of having 1 line running at ful capaciry of 15 per hour is bigger than the profit of having two lines d 27 8 35 33 6 39 29.997 6.666 36.663 29.25 7 36.25 35.75 15 13 28 18 1 ...
View Full Document

Page1 / 2

H3 - 6 a Daytime Minutes Evening Minutes Plan A Monthly...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online