Example Bottom_up_estimate 20

Example Bottom_up_estimate 20 - Bottom-Up Estimate [All...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Bot om-Up Estimate [Al detail resources] Unit Intensity Duration Ef ort Total Unit Extension $ (Day) Unit Cost W1 Prefabrication House $58,310 W1.1 Design Document $2 ,080 W1.1.1 Architecture Design Drawing $13,8 0 W1.1.1.1 Exterior Design Drawing $7,050 R1 Supervisor R1.1 Design Manager Staf Hour 1 20 20 160 $30 $4,80 R2 Designer and Technician R2.1 Architect Day 1 30 30 30 $60 $1,80 R2.9 Draftman R2.9.1 Architecture Draftsman Day 1 15 15 15 $20 $30 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 10 10 * * $75 R4.14 3D Viz Program N/A 1 10 10 * * $75 W1.1.1.2 Interior Design Drawing $3,90 R1 Supervisor R1.1 Design Manager Staf Hour 1 10 10 80 $30 $2,40 R2 Designer and Technician R2.2 Interior Designer Day 1 20 20 20 $60 $1,20 R2.9 Draftman R2.9.3 Interior Draftman Day 1 15 15 15 $20 $30 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 10 10 * * * R4.14 3D Viz Program N/A 1 5 5 * * * W1.1.1.3 Landscape Design Drawing $2,930 R1 Supervisor R1.1 Design Manager Staf Hour 1 2 2 16 $30 $480 R2 Designer and Technician R2.3 Landscape Designer Day 1 20 20 20 $60 $1,20 R2.8 Sanitary Engine r Day 1 15 15 15 $50 $750 R2.9 Draftman R2.9.1 Landscaping Draftman Day 1 15 15 15 $20 $30 R4 Equipment and To ls R4.1 Survey Equipment Day 1 5 5 5 $40 $20 R4.13 AutoCAD20 2 Day 1 10 10 * * * R4.14 3D Viz Program Day 1 5 5 * * * W1.1.2 Engine r Design Drawing $3,60 R1 Supervisor R1.2 Construction Manager Day 1 20 20 20 $50 $1,0 0 R2 Designer and Technician R2.4 Civil Engine r Day 1 20 20 20 $60 $1,20 R2.5 Structural Engine r Day 1 20 20 20 $50 $1,0 0 R2.9 Draftman R2.9.2 Engine ring Draftsman Day 1 20 20 20 $20 $40 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 20 20 * * * W1.1.3 Infrastructure Design Drawing $4,60 W1.1.3.1 Electrical Design Drawing $1,20 R2 Designer and Technician R2.7 Electrical Engine r Day 1 20 20 20 $50 $1,0 0 R2.9 Draftman R2.9.2 Engine ring Draftsman Day 1 10 10 10 $20 $20 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 10 10 * * * W1.1.3.2 Water Sup ly Design Drawing $2,20 R2 Designer and Technician R2.6 Machanical Engine r Day 1 20 20 20 $50 $1,0 0 R2.8 Sanitary Engine r Day 1 20 20 20 $50 $1,0 0 R2.9 Draftman R2.9.2 Engine ring Draftsman Day 1 10 10 10 $20 $20 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 10 10 * * * W1.1.3.3 Air-Conditioning Design Drawing $1,20 R2 Designer and Technician R2.6 Machanical Engine r Day 1 20 20 20 $50 $1,0 0 R2.9 Draftman R2.9.2 Engine ring Draftsman Day 1 10 10 10 $20 $20 R4 Equipment and To ls R4.13 AutoCAD20 2 N/A 1 10 10 * * * W1.2 Structure $30,040 W1.2.1 Building Structure $2 ,30 W1.2.1.1 First Flo r $1 ,515 W1.2.1.1.1 Bearing-Wal Foundation Structure $4,460 R1 Supervisor R1.2 Construction Manager Day 1 5 5 5 $50 $250 R2 Designer and Technician R2.5 Structural Engine r Day 1 5 5 5 $50 $250 R3 Construction Technician R3.3 Carperter Day 3 2 6 6 $10 $60 R3.5 She t-Metal Worker Day 3 5 15 15 $10 $150 R3.6 Laborer Day 3 3 9 9 $10 $90 R3.7 Welding Technician Day 2 3 6 6 $10 $60 R4 Equipment and To ls R4.1 Survey Equipment
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/08/2012 for the course ECON 101 taught by Professor Byron during the Spring '11 term at Amity University.

Page1 / 3

Example Bottom_up_estimate 20 - Bottom-Up Estimate [All...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online