Quiz 2 - 1. (Points: 5) One major problem with MBO is a. it...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
1. (Points: 5) One major problem with MBO is a. it does not work well in non-profit organizations. b. none of the above. c. it decreases employee motivation. d. it discourages individual creativity. e. it does not work well in constantly changing environments. Save Answer 2. (Points: 5) Which of these refer to specific results expected from individuals? a. Operational plans b. Strategic goals
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
c. Operational goals d. Tactical goals e. Mission statements Save Answer 3. (Points: 5) __________ specify future ends and __________ specify today's means. a. Ideas, behaviors b. Mission, vision c. Planning, organizing d. Plans, goals e. Goals, plans
Background image of page 2
4. (Points: 5) The planning process begins with which of these? a. Brainstorming b. A company-wide meeting c. The development of operational goals d. Communication of goals to the rest of the organization e. The development of a mission statement Save Answer 5. (Points: 5)
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/11/2012 for the course MGT 3110 taught by Professor Daivd during the Spring '11 term at Utah Valley University.

Page1 / 8

Quiz 2 - 1. (Points: 5) One major problem with MBO is a. it...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online