PELLYKW1A5Individual Assignment

PELLYKW1A5Individual Assignment - RUNNING HEADER Individual...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
RUNNING HEADER: Individual Assignment Experiential Exercise Kristina Pelly Indiana Wesleyan University The two companies I chose to evaluate are China International Water and Electric Corporation and Tokyo Electric Power Company (TEPCO). China International Water
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
2 and Electric Corporation are located in China, whereas Tokyo Electric Power Company is located in Japan. TEPCO serves Tokyo. As of January 15, 2012 the Fukushima Daiichi Nuclear Power Plant has shut down. This is an environmental risk of TEPCO in Japan. They utilize nuclear energy, which is not safe when a plant fails. Currently, TEPCO is offering compensation to those whom were affected by the plant shutting down. Most of Tokyo is currently without power. Tokyo is also affected by drastic and random blackouts that cause a lot of problem for their residents (TEPCO 2011). According to the China International Water and Electric Corporation (CWE) website, they are an exclusively invested subsidiary of the China Three Gorges Corporation. They invest in both electric and water and have been practicing hydropower
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.
  • Spring '11
  • SMITH
  • Management, Electricity generation, Kashiwazaki-Kariwa Nuclear Power Plant, Tokyo Electric Power Company, China International Water, China International Water and Electric Corporation

{[ snackBarMessage ]}

Page1 / 3

PELLYKW1A5Individual Assignment - RUNNING HEADER Individual...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online