Exercise 11 Cement Pump Hydraulics-1

Exercise 11 Cement Pump Hydraulics-1 - Lab Report 11 Cement...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Lab Report 11 – Cement Pump Hydraulics Title: Cement pump hydraulics Purpose: Determine the pump pressures and horsepower required to complete the average cement job. References: Lab Report 10.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
MEMO TO: Company Drilling Department FROM: District Engineer RE: General Well Planning Please perform the following tasks in continued preparation for the annual planning meeting. Cement Density API Filtrate Blow Thru Viscometer Readings 10 min Gel Free Water (ppg) (ml/30 min) (min) 300 rpm 200 rpm 100 rpm 6 rpm (lb/100 sqft) Content (%) H neat 16.3 180 2.5 68 55 39 16 21 2.4 H + 0.6% Halad 344 15.8 trace NA 129 90 50 5 3 0.0 H + 10% NaCl 16.5 72 NA 58 47 35 16 18 2.2 50% H + 50% Poz 14.1 48 NA 29 24 19.5 12.5 11 3.2 H + 2% Econolite 11.1 133 1.92 21 17 14 7 14 4 H + 8% Bentonite 13.4 116 0.5 152 141 132 60 53 1 Table 1 – Cement Data Cement Thickening Compressive Tensile Time (hrs) Strength (psi) Strength (psi) H neat 2.25 5195 493 H + 0.6% Halad 344 3.25 4617 502 H + 2% Econolite 5.25 248 41
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

Exercise 11 Cement Pump Hydraulics-1 - Lab Report 11 Cement...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online