HWK 7 solution - PGE 362 Homework 7 Solution Due at the...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
PGE 362 Homework 7 Solution Due at the start of lecture on April 13. Data Set: 6 1 psi/ft 0.65 psi/ft =0.7 10,000' 1 10 psi 0.25 10 md drainage area = 80 acres/well 0.167' Productive thickness = 25'. Gross fracture hieght V pore w p D E x v k r σ α = = = = = = = n' 2 f L 3 m m = 75'. 0.6 0.0045 lb -sec /ft 1.01 0.0036 ft/ min 25 bbl/min 230 lb /ft = 8 lb /gal L i p f n K C q c γ ρ = = = = = = Please determine the following. This is best done in a spread sheet for future use. (1) – (9) each worth +0.5 pt (1) Fracturing gradient. 0.8 psi/ft (2) Dynamic fracture width at the well bore. 0.37" (3) Average dynamic fracture width. 0.22" (4) Propped fracture width. 0.11" (5) Fluid efficiency. 0.41 (6) Volume of fluid to inject. 50,409 gal (8) Mass of proppant to use. 170,500 lbm (9) Time to pump the job. 48 mins
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
(10)(+1 pt) Proppant pumping schedule. 0 1 2 3 4 5 6 7 8 9 0 10 20 30 40 50 60 Propant Concetration (pg) Job Time (min) Proppant Schedule (11)(+1 pt) Surface pumping pressure at the following moments if no near well bore
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

HWK 7 solution - PGE 362 Homework 7 Solution Due at the...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online