Chapter 8 Exercise Solutions 8.1. 8.9. Assume n = 5 Process A Process B
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
8.9 continued Prefer to use Process B with estimated process fallout of 0.000001 instead of Process A with estimated fallout 0.001726. 8.10. Process A: Process B: Process B will result in fewer defective assemblies. For the parts indicates that more parts from Process B are within specification than from Process A. 8.17. MTB > Stat > Basic Statistics > Normality Test The plot shows that the data is not normally distributed; so it is not appropriate to estimate capability. 8.18. LSL = 75; USL = 85; n = 25; S = 1.5 (a)
Background image of page 2
(b) This confidence interval is wide enough that the process may either be capable (ppm = 27) or far from it (ppm
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
Background image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 16,395). 8.23. 8.27. (a) Gauge capability: (b) MTB > Stat > Control Charts > Variables Charts for Subgroups > X-bar R Test Results for R Chart of Ex8.27All TEST 1. One point more than 3.00 standard deviations from center line. Test Failed at points: 11, 12 Out-of-control points on R chart indicate operator difficulty with using gage. Suggested 8.15. MTB > Stat > Basic Statistics > Normality Test (Add percentile lines at Y values 50 and 84 to estimate and .) A normal probability plot of response times shows the distribution is close to normal. (a) (b) USL = 2 hrs = 120 mins 8.21. USL = 2350; LSL = 2100; nominal = 2225; (a) (b)...
View Full Document

This note was uploaded on 02/14/2012 for the course IE 530 taught by Professor Ravindran during the Spring '97 term at Purdue University-West Lafayette.

Page1 / 5

Homewor 8 - 16,395). 8.23. 8.27. (a) Gauge capability: (b)...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online