CHAPTER 12S DISCUSSION QUESTIONS 4. A pull system is a JIT system that moves material only as it is needed. A push system sends material to the next workstation at the convenience of the sender, not as it is needed. Thus the
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: inventory level can get very large. 8. The impact of reducing setup cost is that the economical lot size becomes smaller as the setup cost is reduced. Chapter 12 Supplement: Just-In-Time Systems 1...