AIU IT HOMEWORK

AIU IT HOMEWORK - Phase 1 The first phase of Jan and Kim...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Phase 1 The first phase of Jan and Kim Levering’s expansion will consist of the following office floor plan: 1 receptionist area 1 conference room 1 office w/ 15 cubes (for consultants) 1 computer room The existing computer network to be installed at this new building includes: 8 Windows XP systems (1 in Jan's office, 1 in Kim's office, and 6 in the cubes) 1 Windows Server 2003 (in computer room) 1 printer (in computer room) The following logical diagram shows how the equipment will be connected according to the floor plan.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
We will implement this network with the addition of two layer-2 switches: one 48-port switch for connecting the Windows XP workstations to the servers, and another 8-port switch for connecting the printers to the servers. These two switches will each be placed in its own, separate broadcast domain or subnet. The first subnet for the workstations will be the 192.168.0.0 /24 class C subnet, whereas the second subnet for the printers will be the 192.168.1.0 /24 class C subnet. Both networks use the 255.255.255.0 (/24)
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/17/2012 for the course ITCO 101 taught by Professor Gugenhiem during the Spring '12 term at AIU Online.

Page1 / 6

AIU IT HOMEWORK - Phase 1 The first phase of Jan and Kim...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online