Ch 8 Class work - D 1 A LFT - Latest Finish Time Batter on...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Cookie Scheduling Problem 0 B 6 6 6 12 Slack = 6 0 A 0 0 C 10 10 E 12 12 F 24 0 0 0 0 10 10 10 2 12 12 12 24 Slack = 0 Slack = 0 Slack = 0 Slack = 0 0 D 1 Critical Path: A, C, E, F 9 1 10 Slack = 9 Activity Label Time Pred Start A 0 Pre-Heat Oven B 6 A EST Label EFT EST - Estimated Start Time Mix Batter C 10 A LST Time LFT EFT - Estimated Finish Time Grease Cookie Sheet
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: D 1 A LFT - Latest Finish Time Batter on Sheet E 2 C, D LST - Latest Start Time Bake F 12 B, E Critical Path is the path that has a slack of all zeros LATEST TIME IS THE MAXIMUN OF THE PREDECESSOR...
View Full Document

This note was uploaded on 02/19/2012 for the course DECISION S 550 taught by Professor Regan during the Summer '11 term at St. Leo.

Ask a homework question - tutors are online