Excel Template 4_17 21

Excel Template 4_17 - Student Name Class Problem 04-17A SINGH MANUFACTURING COMPANY a Cost Assignment Cost Assignment Categories Salary of V P of

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Student Name: Class: Problem 04-17A SINGH MANUFACTURING COMPANY a. Cost Assignment: Cost Assignment Categories Dept. M Dept. N Indirect Salary of V. P. of Production Division Salary of Supervisor Department M Salary of Supervisor Department N Direct Materials Cost Department M Direct Materials Cost Department N Direct Labor Cost Department M Direct Labor Cost Department N Direct Utilities Cost Department M Direct Utilities Cost Department N General Factorywide Utilities Production Supplies Fringe Benefits Depreciation Total Costs b. Total Estimated Cost of Products: Indirect Allocation Weight Allocated Allocated Costs Rate of Base to Dept. M to Dept. N Salary of Vice President Salary of Vice President General Utilities General Utilities Production Supplies Production Supplies Fringe Benefits Fringe Benefits Depreciation Depreciation Total Indirect Cost c. Price per Unit: Department M N Total Direct Cost Total Indirect Cost Total Production Costs Number of Units Cost per Unit Price
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/22/2012 for the course BUAD 2050 taught by Professor Nicholasw.schroeder during the Spring '09 term at Toledo.

Page1 / 4

Excel Template 4_17 - Student Name Class Problem 04-17A SINGH MANUFACTURING COMPANY a Cost Assignment Cost Assignment Categories Salary of V P of

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online