HOMEWORK_4 SOLUTIONS 1. a. % 70 10 7 capacity Design output Actual n Utilizatio % 5 . 87 8 7 capacity Effective output Actual Efficiency b. % 67 6 4 capacity Design output Actual n Utilizatio % 80 5 4 capacity Effective output Actual Efficiency c. This is not necessarily true. If the design capacity is relatively high, the utilization could be low even though the efficiency was high. 2. % 80 capacity Effective output Actual Efficiency Actual output = .8 (Effective capacity) Effective capacity = .5 (Design capacity) Actual output = (.5)(.8)( Design capacity) Actual output = (.4)(Design capacity) Actual output = 8 jobs Utilization = .4 capacity Design output Actual n Utilizatio jobs 20 4 . 8 capacity Effective output Actual Capacity Design 3. FC = $9,200/month VC = $ .70/unit Rev = $ .90/unit a. units 000 , 46 70 $. 90 $. 200 , 9 $ VC Rev FC Q BEP b. Profit = Rev x Q (FC + VC x Q) 1. P 61,000 = $.90(61,000) [$9,200 + $.70(61,000)] = $3,000 2. P 87,000 = $.90(87,000) [$9,200 + $.70(87,000)] = $8,200 c.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}