MIT2_007s09_f04 - MIT OpenCourseWare http/ocw.mit.edu 2.007 Design and Manufacturing I Spring 2009 For information about citing these materials or

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MIT OpenCourseWare http://ocw.mit.edu 2.007 Design and Manufacturing I Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms .
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2.007 -- Introduction to Design and Manufacturing I Milestone #4 – Most Critical Module Dan Frey and Kaitlyn Becker Deliverable: About 8 Pages in your notebook depositied to the “IN” side of the crate. Due Date: March 2-6 at the normal times (T, R, or F at 4PM). DESCRIPTION: This milestone centers on design of your most critical module (MCM). You want to select some subset of your concept and design it in substantial detail. You need not build the module yet – that activity is scheduled over the next wek weeks and culminates in a demonstration of the finished module on 16 March. There is some flexibility in how you can define a “most critical module”. I would suggest you select a sub-system (e.g., arm, rope puller, or can crusher) based on its influence on your design’s overall success. The module’s criticality may be due to its large contribution to the
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 02/23/2012 for the course MECHANICAL 2.007 taught by Professor Fry during the Spring '11 term at MIT.

Page1 / 2

MIT2_007s09_f04 - MIT OpenCourseWare http/ocw.mit.edu 2.007 Design and Manufacturing I Spring 2009 For information about citing these materials or

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online