MIT2_007s09_f07 - MIT OpenCourseWare http:/ocw.mit.edu...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MIT OpenCourseWare http://ocw.mit.edu 2.007 Design and Manufacturing I Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms .
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2.007 -- Introduction to Design and Manufacturing I Milestone #7 – Design Integration Dan Frey and Kaitlyn Becker Deliverable: About 5 pages in your design notebook. Due Date: March 30 through April 3 at the normal times (T, R, or F at 4PM). DESCRIPTION: This milestone concerns overall design of your system based on the results you attained in making your most critical module. For many of you, this will be an important juncture in your design process. Some of you will want to develop mechanisms that cooperate with the module you just developed (for example to take a can from the field and place it in your crusher). Others may want to reconsider the module they just developed, simplify their approach, and begin to execute a new plan. In either case, the decisions you make now can have a big impact on your
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

MIT2_007s09_f07 - MIT OpenCourseWare http:/ocw.mit.edu...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online