{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

Inventory Systems in Practice

Inventory Systems in Practice - Inventory Systems in...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Inventory Systems in Practice Or “How I got out of doing the last two questions on the final exam”
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
The Project Upgrade the Hood Line to enable the production of another vehicle model and increase output from 800 units per day to 825 units per day Responsibility: Design, Manufacturing, Commissioning, Hood Design Interface, and “connections”
Background image of page 2
System View Body-in-White Storage Area (15 body capacity) Hood Attachment Station Tail Gate Attachment Station Hood Line (Sub-Line to main Weld Assembly Line) Hood Inventory Movement Door Attachment Station Tail Gate Line (Sub-Line to main Weld Assembly Line) Tail Gate Inventory Movement Door Line (Sub-Line to main Weld Assembly Line) Door Inventory Movement To Paint Shop Weld Assembly Line Hood Line Inventory Loop
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Project View Hood Attachment Station Hood Line (Sub-Line to main Weld Assembly Line) Hood Cart Hood Cart Hood Cart Hood Cart Safety Stock and Cycle Stock not in production (on hood carts) Operator Aisle Aisle Inventory Movement
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}