ICA_14 - Delineate the drainage basin. (vii) Hatch the...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
EG 210: CAD and Engineering Application Sections 30, 31 & 32 Fall 2011 ICA #14: Drainage Basin Date Assigned: 10/11/2011 Due Date: 10/13/2011 in the beginning of the class Follow the instructions listed in sections 10.1-10.8 of the text book. Ex1 : (i) Open the labeled contour map from the ICA #13. (ii) Use the layers (in the file) appropriately. (iii) Draw the centerline of the channel. (iv) Show the direction of flow using quick leader. (v) Label the direction of flow using text command, set the text height to be 7 feet. (vi)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Delineate the drainage basin. (vii) Hatch the drainage basin. (viii) Find the length of the channel and area of the drainage basin using text command, set the text height to be 7 feet. (ix) Insert a layout from the “ My_acad_Landscape.dwt ”. (x) Set the viewport scale to 1:800. (xi) Sample file is shown on the next page. ICA Submission Submit the printout of the ICA in the beginning of the class on the due date. 25% penalty for 24 hours late submission. ICA will not be accepted after 24hours....
View Full Document

This note was uploaded on 02/28/2012 for the course ECO 101 taught by Professor Glenn during the Spring '08 term at John Wood CC.

Page1 / 2

ICA_14 - Delineate the drainage basin. (vii) Hatch the...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online