ICA_15 - (iv) Update the blocks. (v) Follow the instruction...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
EG 210: CAD and Engineering Application Sections 30, 31 & 32 Fall 2011 ICA #15: Floodplain Delineation Date Assigned: 10/13/2011 Due Date: 10/20/2011 in the beginning of the class Follow the instructions from the Chapter 11 of the text book. Ex1 : (i) Download the contour file, Floodplain_Delineate-Student.dwg , from the ICA #15’s folder on the BB. The index contours are labeled. (ii) Insert a layout from the “ My_acad_Landscape.dwt ”. (iii) Set the viewport scale to 1:800.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: (iv) Update the blocks. (v) Follow the instruction from the book. (vi) Sample file is shown on the next page. (vii) Use text boxes for areas of the floodplains and length of the channel. (viii) Sample file is shown on the next two pages. ICA Submission Submit the printouts of the ICA (shown on next two pages) in the beginning of the class on the due date. 25% penalty for 24 hours late submission. ICA will not be accepted after 24hours....
View Full Document

Page1 / 3

ICA_15 - (iv) Update the blocks. (v) Follow the instruction...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online