ICA_16(1) - Profile_Existing_Points layer. (xi) Draw a...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
EG 210: CAD and Engineering Application Sections 30, 31 & 32 Fall 2011 ICA #16: PnP Drawing Date Assigned: 10/20/2011 Due Date: 10/25/2011 in the beginning of the class Follow the instructions from the section 12.4 and 13.5 bullet #1 of the text book. Ex1 : (i) Download the contour file from the Lab #16’s folder on the BB. The index contours are labeled. (ii) Insert a layout from the “ My_acad_Portrait.dwt ”. (iii) Set the viewport scale to 1:300. (iv) Draw the centerline of the road using the Road-CL layer. (v) Draw the plan of the road using the Road-Plan layer. (vi) Add the label to the plan of the road using the Road-Plan-Label layer (text height = 30 inches). (vii) Hatch the plan of the road using the Road-Hatch layer. (AR-HBONE, Scale = 5) (viii) Turn-off the Road-Plan , Road-Plan-Label , and the Road-Hatch layers. (ix) Draw the projection lines from the plan of the road to the grid using the Proj layer. (x) Draw the points for the existing profile using the
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Profile_Existing_Points layer. (xi) Draw a polyline for the existing profile using the Profile_Existing_Polyline layer. (xii) Label the existing profile using the Profile_Existing_Label layer (text height = 30 inches). (xiii) Hatch the existing profile using the Profile_Existing_Hatch layer. (EARTH, Scale = 100) (xiv) Draw the proposed profile using the Profile-Proposed layer. The proposed profile starts at the elevation of 1160 feet and its slope is +10%. (xv) Label the proposed profile using the Profile-Proposed-Label layer (text height = 30 inches). (xvi) Turn-on the Road-Plan , Road-Plan-Label , and the Road-Hatch layers. (xvii) Sample file is shown on the next page. ICA Submission No printout Show the ICA to the Instructor or UTA on or before the due date. 25% penalty for 24 hours late submission. ICA will not be accepted after 24 hours....
View Full Document

This note was uploaded on 02/28/2012 for the course ECO 101 taught by Professor Glenn during the Spring '08 term at John Wood CC.

Page1 / 2

ICA_16(1) - Profile_Existing_Points layer. (xi) Draw a...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online