BYU_CS340

BYU_CS340 - Testing – Microsoft Office David Hansen TWC...

Info iconThis preview shows pages 1–11. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Testing – Microsoft Office David Hansen TWC Test Manager 13 years (+2 internships) at Microsoft Started in Outlook (email, attachments, setup, automation) Now shared Office TWC team (security, performance, reliability, feedback) Education BS in Mechanical Engineering from BYU in 1992 MBA from University of Washington in 2006 Personal Grew up in Reno, NV. Married for 15 years to Wendy 3 children (Hayley 13, Dillon 10, Mali 8) Contact info: [email protected] Testing’s role in shipping commercial software The kinds of challenges testers face What makes a great tester Not (intentionally) Recruiting for Microsoft Typical Office/Microsoft PM/Dev/Test team ratio is 0.5 : 1 : 1 More precise definitions at http://www.microsoft.com/college icro-version of product lifecycle esigned for quick spin of information between triad oal is ‘dogfoodable’ feature quality before checking into ‘main’ Planning Start Feature Crew Deliver Feature Specification Deliver Dev Design Doc Deliver Test Design Spec Deliver Detailed Feature Schedule Spec Inspection Implementatio n Deliver Feature Code Deliver Test Automation Check-in Test Verification Perform Code review Run check-in tests Test code on a private release build Check code into main branch Feature Crew Signoff Build Verification Test *Feature Development Office TWC Challenges Data has significant impact on performance results Scale and performance testing about pushing limits How do you get all that data in there?...
View Full Document

Page1 / 30

BYU_CS340 - Testing – Microsoft Office David Hansen TWC...

This preview shows document pages 1 - 11. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online