FDDx - spring 11

FDDx - spring 11 - Today Assign FDDx teams Watch FDDx Video...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Today Assign FDDx teams Watch FDDx Video Overview the assignment Introduce Process Capability Pass Back Exams Time to touch base with your teams 1 2 Process F low D esign and Trial Production D emo Ex ercise (FDDx) Three models of beacons Plain Power Saving D e l u x e Attendance is required! Follow all instructions and deadlines April 21st in the Krannert Drawing Room Overview You will be divided into 4 production teams. Each team will meet outside of class to practice and strategize. On game day, each team will receive orders that must be filled according to certain specifications You will be timed and material usage will be tracked Quality control will determine if your products meet specifications Your team will be responsible for a report summarizing and analyzing the experience. 3 4 Resistors 220, 1K, 3K Chip Capacitor Breadboard with chip Approx. size: 2 x 3 Wire: Cut, splice, insert. Use same color wires on one unit. You can make one wires on one unit....
View Full Document

Page1 / 11

FDDx - spring 11 - Today Assign FDDx teams Watch FDDx Video...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online