HW01_Sp11_revised [1]

HW01_Sp11_revised [1] - MGMT 36100 HW 01 40 Points Due...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MGMT 36100: HW 01 40 Points Due: January 25 Write proper dimensions at each step. Question 1 (4 points: 3, 1) Consider problem 2, page 59 from the textbook (“Rockness Recycling”) and answer the following. (a) Calculate capacity of each stage (per week) and identify the bottleneck. (b) If the process needs to handle 2000 students per week, what should be the largest processing time Question 2 (7 points: 3, 1, 3) A process has 3 stages as shown. P1, P2 etc. are the labels for the machine and the other number in the box is the machine capacity in units per hour. (a) What is the cycle time for each stage (in minutes per unit)? Round off to 2 decimal places if needed. (b) Identify the bottleneck stage (c) If you can add only one machine in parallel at the bottleneck stage, what should be the largest cycle time for the new machine so that you increase the process capacity as much as possible? Week
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/03/2012 for the course MGMT 361 taught by Professor Panwalker during the Spring '10 term at Purdue.

Page1 / 2

HW01_Sp11_revised [1] - MGMT 36100 HW 01 40 Points Due...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online