HW02-Sp11

HW02-Sp11 - MGMT 36100: HW 02 40 Points Due: February 08,...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MGMT 36100: HW 02 40 Points Due: February 08, 2011 Write proper dimensions at each step. Question 1 (10 points: 3, 2, 1, 4) Consider problem 7 at the end of Process Selection chapter (page 121). (a) Develop a precedence diagram . (b) Calculate the target cycle time in seconds for desired output of no less than 500 units in 8 hours. The target cycle time should be an integer in seconds. (c) Determine the minimum number of workstations needed. (d) Perform line balancing using the SPT method and calculate line efficiency . For tie-breaking, use alphabetical order of tasks. Please use all tables and show eligible tasks. Question 2 (8 points: 6, 2) Consider the precedence diagram for an assembly operation shown in the figure to the right. (All task times are in seconds) The target CT (Cycle time) is 21 seconds. (a) Perform line balancing using the RPW method . (Tiebreaker: The smallest task number comes first.). Complete all tables.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

HW02-Sp11 - MGMT 36100: HW 02 40 Points Due: February 08,...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online