HW05-Sp11

HW05-Sp11 - Multiplicity Lead time(weeks Lot size SS On...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MGMT 36100: HW 05 44 Points Due: April 14, 2011 Submit one copy per group. Neatness is expected. Question 1 (Points: 4) Solve problem 17 (parts “a” and “b”) page 314. Question 2 (Points: 8) Determine the item levels using the procedure discussed in class and draw neat product structure diagrams for data in the table on right. Item 1 2 3 4 5 6 7 8 9 10 Childre n 3,7 3,10 4,6 7,8 6,10 9 - - - 8 Question 3: (Points: 16, 16) For both parts (A) and (B), draw product structure diagram and perform MRP calculations using blank MRP templates (with suitable modifications). Use alphabetical order within a given level . If POR value goes into period 0 or earlier, clearly indicate that, tell what action needs to be taken and state how you continue with the rest of the problem. Master Production Schedule Part Week 1 2 3 4 5 6 7 8 9 W 30 30 100 65 100 80 50 65 40 T 60 60 80 10 80 10 70 60 50 Part (A): Level Item Child,
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Multiplicity Lead time (weeks) Lot size SS On hand Scheduled Receipt in (week) W C2, J2, M, R, X3 2 L4L 10 135 1-100 T C3, F2, M2, O 1 L4L 50 20 1-90, 2-80 1 C-2 FOQ 100 50 360 2-300 1 O G, M 2 POQ 3 30 10 2-160 1 R F, G 2 L4L-80-2 F X 2 L4L-100 1-100, 2-250 2 G J 2 POQ 2 100 40 1-300 2 M J 1 L4L-40-3 J-1 FOQ 150 50 200 1-300, 2-300 4 X-1 POQ 2-185-Master Production Schedule Part Week 1 2 3 4 5 6 7 8 9 10 B 30 20 75 60 55 60 40 35 60 75 J 55 60 50 40 15 55 80 90 55 60 Part (B): Item Child, Multiplicity Lead time (weeks) Lot size SS On hand Scheduled Receipt in (week) A X 2 FOQ 300 150 150 2-300 B A2, M 2 L4L-100 2-80 C A2 1 L4L-30-F-1 FOQ 500 500 1500 1-2000 J A4, C, Y2 2 POQ 3 30 90 1-130 M A, X 3 POQ 2 20 30 1-120 X F2 1 POQ 2 50 300 1-700 Y F3 2 L4L 50 100 1-200...
View Full Document

This note was uploaded on 03/03/2012 for the course MGMT 361 taught by Professor Panwalker during the Spring '10 term at Purdue.

Page1 / 2

HW05-Sp11 - Multiplicity Lead time(weeks Lot size SS On...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online