1 MGMT 361 Operations Management (OM) Ch III: Process Selection II 1. Assembly Line Balancing - continued 2. Facility Layout
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Objective: To get a layout (assembly line) with minimum number of stations for a specified target cycle time. Procedure : Start with the precedence diagram . Determine target CT (given a required production rate) .—round down Calculate min # of stations (Total tax time/target CT)- round up Select priority rule (SPT, LPT, RPW) and tie-breaking rule . Start with work station 1. Include as many eligible tasks as possible in each work station without accumulative time exceeding target cycle time . If a task cannot be selected, try next one. If accumulative time exceed targeted CT, create a new station. If all tasks have been included, stop. Assembly Line Balancing (ALB) - Review Eligible task : A task is eligible if all tasks that precede this task have been selected and there are no other restrictions.
Background image of page 2
Effective CT: 60 [sec./unit]. Station Selected Cum. Time Eligible I II III IV V 2 4 5 6 1 7 3 2 50 5 30 , 1 , 50 4 40 6 30 , 7 , 50 , 3 , 60 2,1 / 5, 1, 3 / 5,1 5,1 / 1 / 4 4 / 6 6 / 7 Efficiency: (100 * 200) / (4 * 60) = 83.3%. LPT order 1, 20 2, 50 4, 40 3, 10 5, 30 6, 30 7, 20 Example 1 Target CT = 60 [sec/unit] Total task time = 200 [sec] Lower bound: 4 stations Part (b): LPT rule 2, 3 60 4 40 5, 1 50 6, 7 50 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 2 5 6 7 10 1 8 11 9 12 3 Example 2 - SPT St Selected C. Time Eligible Need 1800 units in 7.5 hours. Target CT = 7.5*3600/1800=15 [sec. /unit] (7.5/1800) *60 *60 = 15 Total task time = 74 sec. Need at least 5 stations. Tot task time/ target CT (74/15 = 4.93) I 2 5 2,1,3 II 1 6 1, 3 III 10 5 10, 9, 3 , 6 , 10 , 4 ,10 , 5 ,15 SPT order 5 5 5 5 5 6 6 6 10 4 9 8 01 02 03 04 05 07 08 09 12 10 06 / 6,1,3 / 5,9,3 /1,3 / 4,5,3 We will show the remaining solution in one click. / 10,9,3 4
Background image of page 4
Example 2 - SPT St Selected C. Time Eligible Target CT = 15 [sec. /unit] I 2, 6 5, 10 2,1,3 /6,1,3 /1,3 II 1 6 1, 3 III 10, 9 5, 13 10, 9, 3 / 9, 3 / 3 Effective CT: 15 sec /unit. Efficiency: 100*[ 74/ (6*15)] = 82.2% , 4 ,10 , 5 , 15 5 5 5 5 5 6 6 6 10 4 9 8 01 02 03 04 05 07 08 09 11 12 10 06 / 5,9,3 / 4,5,3 IV 3, 7 10, 15 3 / 7, 8 / 8 V 8, 11 6, 12 8 / 11 / 12 VI 12 9 9 2, 6 10 10, 9 13 1, 4, 5 15 3, 7 15 8, 11 12 12 9 5
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
St Select Cum. T Eligible I 2,6 5,10 2,1,3 / 6,1,3 / 1,3 II 1,4,5 6,10,15 1, 3 / 4,5,3 /5,9,3 Example 2 – SPT, continued Target CT = 15 [sec. /unit] SPT order 5 5 5 5 5 6 6 6 10 4 9 8 01 02 03 04 05 07 08 09 11 12 10 06 What if tasks 2 & 6 cannot be done in the same station?
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/03/2012 for the course MGMT 361 taught by Professor Panwalker during the Spring '10 term at Purdue University-West Lafayette.

Page1 / 22

student version - Ch3 sec II - MGMT 361 Operations...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online