ACC 505 Module 5 - 250 Unfavorable Variable Overhead...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Direct Materials Price Variance 1008 Unfavorable Direct Materials Quantity Variance 1528 Favorable
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Direct Labor Rate Variance 575 Unfavorable Direct Labor Efficiency Variance 805 Unfavorable
Background image of page 2
Variable Overhead Rate Variance
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 250 Unfavorable Variable Overhead Efficiency Variance 200 Favorable Total Variable OH Costs 38500 Total Fixed OH Costs 16000 Total OH Costs 54500...
View Full Document

This note was uploaded on 03/01/2012 for the course ACCOUTNING 550 taught by Professor Abner during the Spring '11 term at DeVry Houston.

Page1 / 4

ACC 505 Module 5 - 250 Unfavorable Variable Overhead...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online