434 From To Spreadsheet

434 From To Spreadsheet - Fastioner kit K4 600 600 1 1-8...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
TO Receiving Assembly 1 2 3 4 5 6 7 8 9 Part Product Mix Parts Per Unit Load No of unit loads Routing Receiving 1 237 Raw Sheet Metal x1 2843 12 237 1-2 2 67 Shelf Frame P1 1200 119 11 2-4-5-6-7-8 3 Reinforcement Bracket P2 1200 208 6 2-4-5-6-7-8 FROM 4 Left Door P3 600 42 15 2-3-4-5-6-7-8 5 Right Door P4 600 42 15 2-3-4-5-6-7-8 Paint Booth 6 P5 1200 694 2 2-3-4-5-6-7-8 Dry Staging 7 P6 1200 547 3 2-3-4-5-6-7-8 Assembly 8 Base Shelf P7 600 100 6 2-4-5-6-7-8 9 Corner Bracket P8 1200 453 3 2-4-5-6-7-8 Side Panel P9 1200 39 31 2-3-4-5-6-7-8 Top Plate P10 600 102 6 2-4-5-6-7-8 Top Face Plate P11 600 610 1 2-3-4-5-6-7-8 Back Plate P12 600 19 32 2-4-5-6-7-8 Latch Rod guider K1 1200 1200 1 1-8 Front base plant K2 600 610 1 1-8 Shelft bracket K3 600 600 1 1-8
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Fastioner kit K4 600 600 1 1-8 hinge kit K5 600 600 1 1-8 door latch kit K6 600 200 3 1-8 base corner bracket K7 600 600 1 1-8 Handel kit K8 600 300 2 1-8 Ful cabinet C1 600 4 150 8-9 Paint G1 1 1 1 1-7 Epoxy (25 Gal per day) G2 1 1 1 1-8 Stright Side Stamping Press Turret Punch Box and Pan Break Degrease Tank Paint Booth Dry Staging Shipping / Outgoing Stright Side Stamping Press Turret Punch Box and Pan Break Degrease Tank Rear Shelf Placement Bracket Front Shelf Placement Bracket Shipping / Outgoing...
View Full Document

This note was uploaded on 03/01/2012 for the course IMSE 334 taught by Professor Cohn during the Spring '12 term at UNO.

Ask a homework question - tutors are online