Project_2_Timetable - or 25/11 or 26/11 Hardware Project:...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
217150 Introduction to Engineering Project 2 Timetable Date Task(s) Marks 17/11 or 18/11 or 19/11 Hardware Project: Buy components and material. Gather data about project. Software Project: Prepare project flowchart. 5 24/11
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: or 25/11 or 26/11 Hardware Project:  Completion of circuit.  Prepare draft of report. Software Project:  Finalized code of project.  Prepare draft of report. 8/12 or 9/12 or 10/12 Report submission and presentation. 10...
View Full Document

This note was uploaded on 03/10/2012 for the course ENGINEERIN 1034 taught by Professor Dr.shahinbasiratzadeh during the Spring '12 term at Amity University.

Ask a homework question - tutors are online