1 Managerial Economics (ARE) 155 University of California, Davis Fall Quarter, 2011 Instructor: John H. Constantine Homework 7: Due Friday DECEMBER 2 , 2011 PROBLEMS 1 – 4 ARE MIDTERM 2-TYPE QUESTIONS. PROBLEMS 5 – 8 ARE NOT MIDTERM 2 MATERIAL, BUT THEY ARE FINAL EXAM MATERIAL Problem 1 : You are given the following project schedule. The table includes all activities required to complete the project, each activity’s immediate predecessor and each activity’s time of completion (in days.) (a) Develop a project network for this problem. (b) Find the critical path and calculate the total project completion time. (You must find EST, EFT, LST, and LFT to answer this problem. ACTIVITY IMMEDIATE PREDECESSOR TIME (DAYS) A --- 5 B A 6 C A 2 D A 9 E B 9 F C, D 3 G D 7 H D 4 I E,F,G 6 J H 5
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Problem 2 : You are given the following project network. In each hexagon, the top number is activity number and the bottom number is the activity time, in weeks. Determine (i) the critical path and (ii) the number of weeks the project is expected to take. Start Finish 1 8 2 12 3 3 4 9 5 3 6 2 7 12 8 7 9 30 10 21 11 20 12 5 13 16 14 17 15 5 16 6 17 3 Problem 3 : Building a backyard playground for an elementary school consists of nine major activities. The activities and their immediate predecessors are shown here: Activity A B C D E F G H I Immediate Predecessor A, B A, B B C D D, F E, G, H The activity time (in days) for constructing the playground project are given in the table: Activity Optimistic Most Probable Pessimistic A 3 5 6 B 2 4 6 C 5 6 7 D 7 9 10 E 2 4 6 F 1 2 3 G 5 8 10 H 6 8 10 I 3 4 5 (a) Construct the project network. (b) What are the critical activities? (c) What is the expected time to complete the project? (d) What is the probability that the project can be completed in 25 days or fewer?
Background image of page 2
3 Problem 4 : The Manager of a Davis Swim Club is planning the club’s swimming team program. The first team practice is
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/14/2012 for the course ARE 155 taught by Professor Staff during the Fall '08 term at UC Davis.

Page1 / 5

ARE155FA11HW7 - 1 Managerial Economics (ARE) 155 University...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online