Schedule Bar charts Project Planning Dr. Hesham A. Aziz 1 Dr. Hesham A. Aziz
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
How to Draw a Bar chart The bar chart ( Gantt Chart) lists the activities (scope of work) in the left hand column, against a time scale along the top of the page. The scheduling of each activity is represented by a horizontal line or bar, form the activity’s start to finish. The length of the activity line is proportional to its estimated duration. Activity Description Duration Start Date Finish Date Lay foundations 4 days 1 March 4 March Build walls 8 days 5 March 12 March Install roof 3 days 13 March 15 March Activity Data (house building project) Activity Description Mon 1 Thu 2 Wed 3 Thu 4 Fri 5 Sat 6 Sun 7 Mon 8 Tue 9 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14 Mon 15 Lay Foundations Build Walls Install Roof Simple Bar chart (house building project)
Background image of page 2
Activity Number Mon 1 Thu 2 Wed 3 Thu 4 Fri 5 Sat 6 Sun 7 Mon 8 Tue 9 Wed 10 100 200 300 400 500 600 Dr. Hesham A. Aziz 3 Scheduled Bar chart ( over laps)
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 12

7-Bar charts - Project Planning & Schedule Bar charts...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online