Key Points : The WBS subdivides the project into manageable work packages. on fixed price contract the WBS helps to ensure the quotation include the full scope of work. The WBS numbering system uniquely identifies all the work packages. 2 Dr. Hesham A. Aziz
Image of page 2
Dr. Hesham A. Aziz 3 The top-down strategic approach to project planning The top-down strategic approach to project planning
Image of page 3

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
The purpose of the work breakdown structure (WBS) is to subdivide the scope of work into manageable work packages that can be estimated, planned and assigned to a responsible person or department for completion. The breakdown should group similar work together to improve productive efficiency. The main components of the WBS that will be discussed in this chapter are: Structure Methods of subdivision Numbering or coding system Level of detail Number of WBS Levels Roll-up Integrating the WBS/OBS to assign responsibility. Work Breakdown Structure 4 Dr. Hesham A. Aziz
Image of page 4
Creating the Work Breakdown Structure Creating the Work Breakdown Structure Work Breakdown Structure (WBS) An hierarchical outline (map) that identifies the products and work elements involved in a project. Defines the relationship of the final deliverable (the project) to its sub-deliverables, and in turn, their relationships to work packages. Best suited for design and build projects that have tangible outcomes rather than process-oriented projects. 5 Dr. Hesham A. Aziz
Image of page 5

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Hierarchical Breakdown of the WBS Hierarchical Breakdown of the WBS 6 Dr. Hesham A. Aziz
Image of page 6
Work Package: Work package including the following Specifications Quality requirements Estimate (man hours) Budgets Duration Procurement Resources Equipment requirements 7 Dr. Hesham A. Aziz
Image of page 7

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
WBS/Work Packages to Network From Work Package to Network From Work Package to Network 8 Dr. Hesham A. Aziz
Image of page 8
1. The WBS Structure There are tow methods of presenting the WBS: Graphically in boxes. Text indents. The WBS is a hierarchical structure which is best presented by a graphical subdivision of the scope of work in boxes. House Civil Plumbing Electrical Wiring Appliances Piping Sewerage Foundations Walls/Roof House Project WBS Subdivided into Boxes 9 Dr. Hesham A. Aziz
Image of page 9

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
The other method of presentation shows the scope of work as text indents, where each level is tabbed to represent its level in the hierarchy . 1.0.0 House Project 1.1.0 Civil 1.1.1 Foundations 1.1.2 Walls and roof 1.2.0 Plumbing 1.2.1 Piping 1.2.2 Sewerage 1.3.0 Electrical 1.3.1 Wiring 1.3.2 Appliances 10 Dr. Hesham A. Aziz
Image of page 10
WBS Coding WBS Coding 11 Dr. Hesham A. Aziz
Image of page 11

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
2. Method of Sub-Division There is not necessarily a right or wrong structure because what may be an excellent fit for one discipline may be an awkward burden for anther.
Image of page 12
Image of page 13
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern