Project Control I Dr. Hesham A. Aziz 1 Dr. Hesham A. Aziz
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Key Points : - Project control guides the project plan to completion . Over optimistic reporting may lull you into a false sense of achievement . Develop data capture proformas to accurately capture your earned progress . 2 Dr. Hesham A. Aziz
Background image of page 2
Dr. Hesham A. Aziz 3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  Murphy’s Law :  “if everything seems to be going well, obviously do not know  what’s going on! “ The project’s baseline plan is the course to steer, with the tracking  and monitoring functions ascertaining the project’s position with respect to  time, procurement, resources and costs.  If  the  project  is  off  course,  then  control  in  the  form  of  corrective  action must be applied   4 Dr. Hesham A. Aziz
Background image of page 4
1. The Need for Project Control As project increase in size and complexity, so the progress reporting needs to move from a subjective assessment of progress to a more structured approach . 5 Dr. Hesham A. Aziz
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2. Scope of Control Scope Management : The scope of work (SOW) defines what the project is producing or delivering . The control or the scope of work is also called configuration management . Planning documents : Project charter Work Breakdown Structure (WBS) Activity list / bill of materials (BOM) Drawing register Specification register Contract Control documents : Project communications Impact statements Variation and Modifications Change requests Closeout report 6 Dr. Hesham A. Aziz
Background image of page 6
Technical Support : Technical support from the design office and drawing office extends from interpreting the client’s brief to addressing day to day problems within statutory regulations and good building practice . Planning documents : Client’s brief Statutory regulations Specifications Design calculations Build-method Control documents : Configuration control Impact statements Commissioning As-built drawings 7 Dr. Hesham A. Aziz
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Time Management : Outlines the sequence and timing of the cope of work . Planning documents :
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 03/17/2012 for the course CEM 661 taught by Professor Dr.heshama.aziz during the Spring '10 term at American University in Cairo.

Page1 / 23

18- Project Control I - ProjectControl I Dr.HeshamA.Aziz 1...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online