HW_09CyclicScheduling - ORIE 3120: Industrial Data and...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 ORIE 3120: Industrial Data and Systems Analysis Spring 2011 Homework # 9 Due Date: 4/5/11 (Tuesday) 4:00 pm. Rhodes Hall Course Dropbox No Late Homework Accepted Since Solutions will be Posted for Exam Preparation 1. Cyclic Scheduling (10 points) Consider the two worker cell from the appendix to the cyclic scheduling lecture. The part flow is as follows: C-03, D-02, K-40, G-58, F-10, J-22, N-78. That is, a part only visits one machine in those groups that consist of two machines (the K-40’s, G-58’s, or F-10’s). Using CGANTT, I have created an operation routine chart for this cell (next page). The vertical time slices are 6 minutes apart. You should be able to read off start and stop times to the nearest minute from this. Operator 1 (in yellow) visits C-03, D-02, J-22, N-78, C-03, D-02, N-78, and then returns to C-03 and repeats the pattern. Every time the operator visits station C-03, he or she is inserting a new part into the cell. Every time he or she visits cell N-78, a part
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

HW_09CyclicScheduling - ORIE 3120: Industrial Data and...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online