MemoInstructions - Northwest Products, Inc . INTEROFFICE...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Northwest Products, Inc . INTEROFFICE MEMORANDUM To: Arthur Franklin, Production Supervisor From: Derek Hunter Subject: Hydraulic Leak in Chassis Assembly Area Date: March 24, 2005 Purpose This memo is to alert you of a reported hydraulic oil leak in the chassis assembly area; including the exact location and instructions on correcting the issue with proper documentation. As production supervisor, company policy requires that you personally oversee the repair and sign the repair ticket before production can resume. Background Since you have held the position of production supervisor for only a few weeks, I would like to give you some background information regarding the repair procedure for issues such as the current hydraulic leak. Although product contamination in our manufacturing process is not typically an issue, introduction of petroleum-based materials to our...
View Full Document

This note was uploaded on 03/23/2012 for the course ITEC 3290 taught by Professor Dunn during the Spring '12 term at East Carolina University .

Page1 / 3

MemoInstructions - Northwest Products, Inc . INTEROFFICE...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online