Manufacturing Cost

Manufacturing Cost - $7.25 hrs x rate $725.00 p/pr/c Total...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Manufacturing Cost Direct Cost Item Cost Per Unit Need per suit Unit Cost Per Suit Classication Wool Paterns $12.00 4.5 Yards $54.00 p/pr Thread $1.25 2 yards $2.50 p/pr Dupioni Silk $8.00 2.5 yards $20.00 p/pr Gold Buttons $2.50 8 buttons $20.00 p/pr Total $96.50 Labor Direct Hours Factory Rate Job 1 330 $7.25 hrs x rate $2,392.50 p/pr/c job 2 400 $7.25 hrs x rate $2,900.00 p/pr/c Job 3 100
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $7.25 hrs x rate $725.00 p/pr/c Total 830 $6,017.50 Factory Overhead Utillties Payable $900.00 p/c Accumlated Depr. $1,000.00 p/c Indirect Labor Direct Hours Factory Rate pd/c Office Staff Payable 300 $6.00 hrs x rate $1,800.00 Total Factory Overhead $1,800.00 Classfication Key P Product Pr Prime C Conversion Pd Perdiod...
View Full Document

Ask a homework question - tutors are online