1 Session 5 20060301 Management of Large Projects and Case Study Characteristics of Large Projects • Integral part of urban development & influence it • Multi-dimensions of system performance • Evaluation involves subjective judgment of relative value of different dimensions • System of minimum resources cost – basis for assessing economic cost of intangible itmes
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2 Apportionment of Benefit • To be fair and acceptable to all stake- holders • Financial return – means to attract private sector investment or to undertake the project Urban Development Tasks • Planning: Vision to Preliminary Design • Design: Preliminary design to Detail Design • Construction: to Physical state • Operation: Use of the works • Maintenance: keeping in operational state
Background image of page 2
3 Work Agents • In-house • Consultants • Contractors Work agents to be managed Management Agents • Works manager: e.g. TCP • Financial manager • Project manager: for client, consultant or contractor • Control agents: AP.RSE, RGE, RGBC
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 • Social system – Fundamental philosophy • Feasibility – Conflict of private & public interest • Ownership is incentive to hard work • Operating surplus to finance project Management Tasks • Planning – Foundation of management • Operational & maintenance – generates new requirements
Background image of page 4
Form of Service Provision • Separate service for design, constrction, operation and operation •D •BOT • Other combinations Consultants Management • Objective: Optimum provision of the necessary construction general principle on copy right • Monthly reports by consultant • ½-yearly & annual review of consultants
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 36

05 Management of large projects and case study - Session 5...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online