Task Task Name Resource Assignments: Resource Initials [percent assigned] 1 "HUNTSVILLE - Project" 2 PLANNING PHASE 3Select Architect FS [60%]; PM [10%] PM [15%]; CP [80%] 5Select Real Estate Consultant PM [10%]; FS [50%] 6Pre-Production Plan PS [80%]; ME [85%]; PM [20%] 7Create Production Plan 8Building Concept FS [40%]; AC [70%] 9Building Design FS [20%]; AC [10%] 10Site Procurement RC [70%]; MS [20%]; FS [30%] 11Select General Contractor PM [10%]; RC [30%]; GC [10%]; AC [15%] 13 PREPARATION PHASE 14Site Preparation PM [20%]; RC [20%]; GC [20%] 15Building Construction PM [10%]; FS [20%]; GC [35%] 16Landscaping
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: FS [15%] 17 PLANT READINESS PHASE 18Plant Personnel Recruiting FS [10%]; PS [10%]; PM [10%]; MS [10%]; PD [10%] 19Equipment Procurement ME [40%]; PA [25%] 20Raw Material Procurement 21Equipment Installation PS [10%]; ME [30%]; FS [40%] 22Product Distribution Plan MS [45%]; TM [40%] 23Truck Fleet Procurement PA [20%]; TM [10%]; AD [10%] 24Pre-Production Plan PS [15%]; ME [70%] 25 PRODUCTION PHASE 26Production Start-Up PS [30%]; ME [70%] 27Distribution MS [20%]; TM [60%] PS [60%]; ME [80%]; MS [20%] PM [10%]; FS [30%]; PS [10%], AC [15%] PS [10%]; ME [10%]; AD [10%]; PA [20%]...
View Full Document

Ask a homework question - tutors are online