Exam 2 - 0.12 0.12 0.12 0.12 0.12 0.12 TIME 1 2 3 4 5 6 7 8...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
PROJECT A R = 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 TIME 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 CASH FLOW -1,250,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 350,000 NPV 1,364,305 IRR 28% PROJECT B R = 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 0.12 0.12 0.12 0.12 0.12 0.12 TIME 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 CASH FLOW-1,400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 NPV 1,587,777 IRR 28%...
View Full Document

This note was uploaded on 03/26/2012 for the course F1515 F1515 taught by Professor Stan during the Spring '10 term at Keller Graduate School of Management.

Ask a homework question - tutors are online