test 1 with answers

test 1 with answers - Review Test Submission MAN3506 Sp...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
7/23/11 2:43 AM Review Test Submission: MAN3506 Sp 2011 First Exam (Chapters 1 - 5) Page 2 of 17 machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 80 E-1000s; 65 S-2000s; 35 P-2000s; and 20 N-1000s. Processing Time (Minutes Per Printer) Model Machine 1 Machine 2 Machine 3 Machine 4 E-1000 (E) 10 15 15 5 S-2000 (S) 10 10 10 10 P-2000 (P) 5 10 15 10 N-1000 (N) 5 5 5 10 In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. Use the information in Table 7.6. Using the traditional method, in what sequence should products be scheduled for production? a. N, S, E, P b. N, E, P, S c. P, E, N, S d. E, S, P, N Selected Answer: d. [None Given] Question 3 In Statistical Process Control, ______________ are used to detect defects and determine if the process has deviated from design specifications. a. Flowcharts b. Cause-and-Effect Diagrams c. Process Capability Charts d. Control Charts Selected Answer: d. [None Given] 2.5 out of 2.5 points
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
7/23/11 2:43 AM Review Test Submission: MAN3506 Sp 2011 First Exam (Chapters 1 - 5) Page 3 of 17 Question 4 The process that facilitates the placement of orders and identifies, attracts, and builds relationships with external customers is called the: a. customer relationship process. b. new service development process. c. order fulfillment process. d. supplier relationship process. Selected Answer: a. [None Given] Element Performance Rating (%) Average Element Time (in minutes) # 1 80 3.6 # 2 100 2.5 # 3 110 3.1 Question 5 Scenario 1.1 A job consists of three elements. Twenty observations for each element were timed, and the resulting data are shown in the following table. A performance rating has also been assigned for each element, as shown in the table. The job has an allowance of 20% of normal time. Use the information in Scenario 1.1. What is the normal time for the entire job? a. Greater than or equal to 10.0 minutes b. Less than 10.0 minutes but greater than or equal to 8.5 minutes c. Less than 8.5 minutes but greater than or equal to 7.0 minutes d. Less than 7.0 minutes 2.5 out of 2.5 points 2.5 out of 2.5 points
Background image of page 2
7/23/11 2:43 AM Review Test Submission: MAN3506 Sp 2011 First Exam (Chapters 1 - 5) Page 4 of 17
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 16

test 1 with answers - Review Test Submission MAN3506 Sp...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online