Full Test and Answers - Question 1 2 out of 2 points In...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Question 1 2 out of 2 points In early phases of a project life cycle, resource needs are usually ____ and the level of uncertainty is ____. Answer Selected Answer: lowest; highest Question 2 2 out of 2 points The ____ model requires heavy user involvement, and developers use a model to generate functional requirements and physical design specifications simultaneously. Answer Selected Answer: Question 3 2 out of 2 points Many companies have realized that information technology is integral to their business and have
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
created a vice president or equivalent-level position for the head of information technology, often called the ____. Answer Selected Answer: CIO Question 4 2 out of 2 points ____ is a problem- solving approach that requires defining the scope of the system, dividing it into its components, and then identifying and evaluating its problems, opportunities, constraints, and needs. Answer Selected Answer: Systems analysis Question 5 2 out of 2 points In a ____, program managers report to the CEO. Answer Selected Answer:
Background image of page 2
Question 6 2 out of 2 points Most trade schools, colleges, and universities did not start offering degrees in computer technology, computer science, management information systems, or other information technology areas until the ____. Answer Selected Answer: 1970s Question 7 2 out of 2 points A preliminary or rough cost estimate is developed in the ____ phase, and an overview of the work involved is created. Answer Selected Answer: concept Question 8 2 out of 2 points The ____ model uses an approach
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
in which developers work with an evolving prototype. Answer Selected Answer: RAD life cycle Question 9 2 out of 2 points A ____ is the hierarchy most people think of when picturing an organizational chart. Answer Selected Answer: Question 10 2 out of 2 points The term “systems approach” emerged in the ____. Answer Selected Answer: 1950s Question 11 2 out of 2 points Projects involve ____ project management process groups. Answer
Background image of page 4
Selected Answer: five Question 12 0 out of 2 points The project cost management knowledge area maps to the ____ process group through the activities of estimating costs and budget determination. Answer
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 19

Full Test and Answers - Question 1 2 out of 2 points In...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online