Full Test and Answers - Question 1 2 out of 2 points In...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Question 1 2 out of 2 points In early phases of a project life cycle, resource needs are usually ____ and the level of uncertainty is ____. Answer Selected Answer: lowest; highest Question 2 2 out of 2 points The ____ model requires heavy user involvement, and developers use a model to generate functional requirements and physical design specifications simultaneously. Answer Selected Answer: Question 3 2 out of 2 points Many companies have realized that information technology is integral to their business and have
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
created a vice president or equivalent-level position for the head of information technology, often called the ____. Answer Selected Answer: CIO Question 4 2 out of 2 points ____ is a problem- solving approach that requires defining the scope of the system, dividing it into its components, and then identifying and evaluating its problems, opportunities, constraints, and needs. Answer Selected Answer: Systems analysis Question 5 2 out of 2 points In a ____, program managers report to the CEO. Answer Selected Answer:
Background image of page 2
Question 6 2 out of 2 points Most trade schools, colleges, and universities did not start offering degrees in computer technology, computer science, management information systems, or other information technology areas until the ____. Answer Selected Answer: 1970s Question 7 2 out of 2 points A preliminary or rough cost estimate is developed in the ____ phase, and an overview of the work involved is created. Answer Selected Answer: concept Question 8 2 out of 2 points The ____ model uses an approach
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
in which developers work with an evolving prototype. Answer Selected Answer: RAD life cycle Question 9 2 out of 2 points A ____ is the hierarchy most people think of when picturing an organizational chart. Answer Selected Answer: Question 10 2 out of 2 points The term “systems approach” emerged in the ____. Answer Selected Answer: 1950s Question 11 2 out of 2 points Projects involve ____ project management process groups. Answer
Background image of page 4
Selected Answer: five Question 12 0 out of 2 points The project cost management knowledge area maps to the ____ process group through the activities of estimating costs and budget determination. Answer
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 19

Full Test and Answers - Question 1 2 out of 2 points In...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online