Eng106 proj. info

Eng106 proj. info - Table F-2 Inland valley maintenance and...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
General info. Project name: Objective Steps: 1. How much materials we need for 3 types concretes? 2. Cost of concrete? 3. READ chapter 2 in manual(Discount rate-2.3, M&R-2.4), figure out mill-and-overlay, what is TI value? (traffic index on a given day. M&R – Maintenance and rehabilitation is ?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Table F-2 Inland valley maintenance and rehabilitation schedule What is I-80 consider class 1 Route If you have questions, we will discuss more on Friday morning. CONTINUOUSLY REINFORCED CONCRETE PAVEMENT- 400050; Cost-Jointed plain concrete pavement- 401050 HOT MIX ASPHALT (TYPE A)- 390132...
View Full Document

{[ snackBarMessage ]}

Page1 / 4

Eng106 proj. info - Table F-2 Inland valley maintenance and...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online