Key_Assignment 1-spr2012 - MGMT 405: Six Sigma Quality...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: MGMT 405: Six Sigma Quality Management Assignment 1 Solution 1. a. (i) X is Normal ( 1.5 + , ) USL = 5.5 + , LSL = 5.5 - P (X>USL) = P (Z>4) = .000032 P (X<LSL) = P (Z<-7) = 0 DPM = 32 (ii) X is Normal ( 1 + , ) USL = 3.5 + , LSL = 3.5 - P (X>USL) = P (Z>2.5) = .006210 P (X<LSL) = P (Z<-4.5) = .0000034 DPM = 6213.4 b. 2. a. Characteristic D U OP TOP DPU DPO DPM O A 56 300 88 26400 0.186 7 0.002121 2121 B 44 350 75 26250 0.1257 0.00167 6 1676 C 30 55 32 1760 0.5455 0.017045 17045 D 83 50 60 3000 1.660 0.027667 27667 E 95 630 70 4410 0.1508 0.002154 2154 F 53 800 40 32000 0.066 3 0.001656 1656 52319 b. D C E A B F 27667 17045 2154 2121 1676 1656 52.9 32.6 4.1 4.1 3.2 3.2 52.9 85.5 89.6 93.6 96.8 100.0 10000 20000 30000 40000 50000 20 40 60 80 100 Defect Count Percent Cum % Percent Count Pareto Chart for C1 2 c. Characteristics D and C require special attention as these two together accounts for the 85.5% of the defects....
View Full Document

This note was uploaded on 04/04/2012 for the course MGMT 405 taught by Professor Staff during the Spring '08 term at Purdue University-West Lafayette.

Page1 / 7

Key_Assignment 1-spr2012 - MGMT 405: Six Sigma Quality...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online