Assignment # 5 – Project Planning – Project Networks ISDS 4113 (10 points) ** ANSWER SHEET ** 1. Use the following information to draw a project network. Activity Predecessor A none B A C A D B E B F C G D,E H F I F J G,H K J,I Answer: A C D E F G H I J B K
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
2. The marketing department of a bank is developing a new mortgage plan for housing contractors. Draw a project network given the information below. Complete the forward and backward pass, compute the activity slack, and identify the critical path.
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Activity Predecessor Time (weeks) A None 3 B None 4 C A 2 D C 5 E B 7 F D,E 1 G D 4 H F,G 5 Critical path =A-C-D-G-H Legend: ES ID EF SL Description LS Dur LF A 3 3 3 B 4 2 2 4 6 3 C 5 3 2 5 5 D 10 5 5 10 4 E 11 2 6 7 13 11 F 12 2 13 1 14 10 G 14 10 4 14 14 H 19 14 5 19...
View Full Document

This note was uploaded on 04/05/2012 for the course ISDS 4113 taught by Professor Staff during the Spring '08 term at LSU.

Page1 / 2

Assignment5Answer - Activity Predecessor Time (weeks) A...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online