examchap5

examchap5 - Folk Exam Questions - Chapter 5 1. An analysis...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Folk Exam Questions - Chapter 5 1. An analysis of past janitorial costs indicates that janitorial cost is an average of $0.80 per machine-hour at an activity level of 40,000 machine-hours and $1.00 per machine- hour at an activity level of 32,000 machine-hours. Assuming that this activity is within the relevant range, what is the total expected janitorial cost if the activity level is 37,000 machine-hours? Solution: Using the data provided above, janitorial costs are fixed (rather than variable or mixed) in nature; that is, they total $32,000 at both 40,000 and 32,000 machine hours. Machine Hours Cost per Machine Hour Total Cost 40,000 $0.80 $32,000 32,000 $1.00 $32,000 Accordingly, janitorial costs would be expected to be $32,000 at 37,000 machine hours (or at any other level of machine hours within the relevant range). 2. Shipping expense is $10,000 for 1,000 pounds shipped and $13,750 for 1,500 pounds shipped. Assuming that this activity is within the relevant range, if the company ships
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

examchap5 - Folk Exam Questions - Chapter 5 1. An analysis...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online