IBM-Tivoli-Storage-Manager-v5-3-and-v5-4-Operator-(000-904).pdf - IBM 000-904 IBM Tivoli Storage Manager v5.3 and v5.4 Operator

IBM-Tivoli-Storage-Manager-v5-3-and-v5-4-Operator-(000-904).pdf

This preview shows page 1 - 4 out of 7 pages.

000-904 IBM IBM Tivoli Storage Manager v5.3 and v5.4 Operator
Answer: D QUESTION:89 What are the consequences of canceling a backup storage pool command? A. The copy pool will be corrupted and must be recreated. B. When the next copy storage pool for that pool is run, it will update the copy pool with all the information from the primary pool. C. The copy pool will be corrupted. The audit copypool command must be run to repair it before any more operations can be attempted. D. When the next copy storage pool for that pool is run, it will update the copy pool only with information that is not already in the copy pool. Answer:D QUESTION:90 How can you determine the percent used for volumes that are assigned to a particular storage pool? QUESTION:91 Several client backups are not progressing. Which action should you take to begin looking for a cause? 34

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture