Planning-and-Designing-ProLiant-Solutions-for-the-Enterprise-(HP0-S29).pdf - HP HP0-S29 Planning and Designing ProLiant Solutions for the Enterprise

Planning-and-Designing-ProLiant-Solutions-for-the-Enterprise-(HP0-S29).pdf

This preview shows page 1 - 4 out of 7 pages.

HP0-S29 HP Planning and Designing ProLiant Solutions for the Enterprise
Image of page 1
QUESTION: 147 DRAG DROP Click the Task button. Match the appropriate availability level with its correct description. Answer: QUESTION: 148 What is the main purpose of the ECC memory controller? 55
Image of page 2
A. to detect single-bit errors B. to detect and correct single-bit errors C. to detect multi-bit errors D. to detect and correct multi-bit errors within a single DRAM chip Answer: B QUESTION: 149 Which statements correctly describe the HP Server Console Switch G2 with Virtual Media?(Select two.) QUESTION: 150
Image of page 3
Image of page 4

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture