The proposed system is designed plans are laid out

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: system is designed. Plans are laid out concerning the physical construction, hardware, operating systems, programming, communications, and security issues. The new system is developed. The new components and programs must be obtained and installed. Users of the system must be trained in its use, and all aspects of performance must be tested. If necessary, adjustments must be made at this stage. The system is put into use. This can be done in various ways. The new system can phased in, according to application or location, and the old system gradually replaced. In some case...
View Full Document

This note was uploaded on 07/18/2012 for the course BUSINESS 101 taught by Professor Various during the Spring '11 term at University of Phoenix.

Ask a homework question - tutors are online