Designing-Multi-Site-HPE-Storage-Solutions-(HPE0-J58).pdf -...

This preview shows page 1 - 3 out of 5 pages.

HPE0-J58HPE0-J58 DumpsHPE0-J58 BraindumpsHPE0-J58 Real QuestionsHPE0-J58 Practice TestHPE0-J58 dumps freeHPDesigning Multi-Site HPE Storage Solutions
QUESTION 53A customer has two HPE Nimble arrays that are replication partners. The replication schedule is set to every hour.After replication completed at 1:00pm, the array at the primary site suffers a power failure.Applications were failed over successfully by the administrators, and production continued on the secondary site array as designed. At3:00pm, the power was restored to the primary site array.What does the administrator need to do first to restore services in the primary site?

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 5 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
Mohammad Alizadeh
Tags
HPE 3PAR

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture