MGT 390 Review Questions for Test Two 1. Explain what is meant by process capacity and the various definitions of capacity. 2. Explain why the book says the relation below is true: Throughput ≤ Process Capacity ≤ Effective Capacity ≤ Theoretical Capacity 3. What is a resource pool?  What is its relationship to the bottleneck? Resource pool – A collection of interchangeable resources that can perform an identical  set of activities. 4. What is the relationship of the resource pool to capacity? 5. Be able to explain the equations on p. 125. )
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  6. Be able to explain the key terms on p. 125. Availability loss factor – Resource availability loss as a fraction of scheduled availability. Blockage – An event that occurs when resources are prevented from producing more  flow units because there is no place to store the already processed flow units or  because additional processing has not been authorized. Bottleneck – Slowest resource pool.  See also Theoretical bottleneck; Effective  bottleneck. Capacity utilization of a resource pool – The degree to which resources are utilized by a  process; the ratio of throughput and theoretical capacity of resource pool. Changeover – The cleaning, resetting, or retooling of equipment in order for it to process  a different product.  Also called setup. Effective bottleneck – The resource pool with least effective capacity. Effective capacity of a process – The effective capacity of the effective bottleneck.
Background image of page 2
Effective capacity of a resource unit – The maximum flow rate of a resource unit if it  were fully utilized during its net availability, that is, if there were no periods of resource  idleness. Load batching – The phenomenon of a resource processing several flow units  simultaneously; the number of units processed simultaneously is called the load batch. Lot size – The number of units processed consecutively after a setup.  Also called setup 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 9

390 Test 2 Review - MGT 390 Review Questions for Test Two...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online