MRP HW - 1 2 3 4 5 6 7 8 LT B = 2: SS B =0 Gross Req. 150...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
MRP Exercise Homework 8 ┌─── The Planned Order Release of the parent Level │ A │ 0 └─┬─┘ is the gross requirements of the child. ┌──────────────┼─────────────┐ ┌──┴──┐ ┌─┴──┐ ┌─┴──┐ 1 │ B(3)│ │C(1)│ │D(2)│ └─┬───┘ └─┬──┘ └─┬──┘ ┌────┴─────┐ If no scheduled receipt shown, then it is 0. ┌─┴──┐ ┌─┴──┐ ┌─┴──┐ ┌─┴──┐ 2 │E(2)│ │F(2)│ │F(1)│ │E(1)│ └────┘ └────┘ └────┘ └────┘ A: Q A = L4L LT A = 2 wk, SS A =0 1 2 3 4 5 6 7 8 9 10 Gross Req. 50 65 80 Plan Order Rel 50 65 80 B: OQ B = L4L
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 2 3 4 5 6 7 8 LT B = 2: SS B =0 Gross Req. 150 195 240 Sched. Rec. 50 On Hand 150 150 50 50 50 Net Requirements 145 240 Plan Rec. 145 240 Plan Order Rel 145 240 C: OQ C =L4L 1 2 3 4 5 6 7 8 LT C = 2: SS C = 0 Gross Req. 50 65 80 On Hand 50 50 Net Requirements 65 80 Plan Rec. 65 80 Plan Order Rel 65 80 D: OQ D = L4L 1 2 3 4 5 6 7 8 LT D = 1:SS = 0 Gross Req. 100 130 160 On Hand 50 50 Net Requirements 50 130 160 Plan Rec. 50 130 160 Plan Order Rel. 50 130 160 E: OQ E = L4L 1 2 3 4 5 6 7 8 LT E =2 SS E =0 Gross Req. 50 190 130 480 160 On Hand 100 50 50 Net Requirements 140 130 480 160 Plan Rec. 140 130 480 160 Plan Order Rel. 140 130 480 160...
View Full Document

This note was uploaded on 04/07/2008 for the course MGT 390 taught by Professor Fredendall during the Fall '07 term at Clemson.

Ask a homework question - tutors are online